Skip to main content

Table 7 2SYS-GMM results

From: Does corporate governance spur bank intellectual capital in an emerging economy? A system GMM analysis from Ethiopia

Variables

Model (1)

Model (2)

Model (3)

Model (4)

HCE

SCE

RCE

M-VAIC

L. HCE

0.592***

   

(0.055)

   

L. SCE

 

0.538***

  
 

(0.123)

  

L. RCE

  

0.670***

 
  

(0.174)

 

L. M-VAIC

   

0.732***

   

(0.083)

BS

− 2.018***

− 0.521**

− 0.170**

− 2.021***

(0.679)

(0.207)

(0.079)

(0.709)

BMF

− 0.013***

− 0.003***

− 0.001*

− 0.013**

(0.004)

(0.001)

(0.000)

(0.006)

BGD

0.004

− 0.081

− 0.094

− 0.801

(0.532)

(0.080)

(0.062)

(0.516)

REM

0.119***

0.028***

0.001

0.132***

(0.040)

(0.009)

(0.003)

(0.043)

BSC

0.030

0.005

0.0001

0.052

(0.033)

(0.008)

(0.004)

(0.054)

ACS

− 0.122

− 0.041***

0.010

− 0.154***

(0.081)

(0.015)

(0.019)

(0.056)

ACMF

0.029*

− 0.003

− 0.002

0.019

(0.017)

(0.008)

(0.002)

(0.019)

LEV

− 0.283

− 0.889

− 0.420

− 1.920

(2.069)

(0.562)

(0.471)

(2.626)

AGE

0.202

0.072

− 0.069

− 0.911*

(0.687)

(0.104)

(0.061)

(0.473)

BSIZE

− 0.482

− 0.121**

0.044**

0.079

(0.321)

(0.062)

(0.018)

(0.281)

 

7.324***

2.724**

0.188

4.253*

(2.155)

(1.180)

(0.423)

(2.523)

Diagnostic tests

    

Observations

154

154

154

154

Number of banks

14

14

14

14

AR (1) test (p value)

0.0139

0.0587

0.0854

0.0054

AR (2) test (p value)

0.905

0.484

0.370

0.433

Hansen test (p value)

0.743

0.539

0.122

0.182

  1. Standard errors in parentheses; ***p < 0.01, **p < 0.05, *p < 0.1; L. HCE, lagged HCE; L. SCE, lagged SCE; L. RCE, lagged RCE; L. M-VAIC, lagged M-VAIC; BS, board size; BMF, board meeting frequency; BGD, board gender diversity; REM, board remuneration; BSC, number of board subcommittees; ACS, audit committee size; ACMF, audit committee meeting frequency; LEV, bank leverage; AGE, bank age; BSIZE, bank size