Skip to main content

Table 4 Lag length selection outcomes from the indicators between 1985 and 2020

From: Industrial output growth and foreign direct investment in Nigeria

VAR Lag Order Selection Criteria

Endogenous variables: IDT, FDI, EXR, INF, TOP, GCF and LPR

Lag

LogL

LR

FPE

AIC

SC

HQ

0

− 1117.768

NA

1.28e + 20

66.16281

66.47706

66.26998

1

− 1003.984

174.0230

3.01e + 18

62.35197

64.86598*

63.20932

2

− 933.6745

78.58073*

1.27e + 18*

61.09850*

65.81226

62.70603*

  1. Source: Author’s computation
  2. *indicates lag order selected by the criterion
  3. AIC: Akaike information criterion, FPE: Final prediction error, LR: sequential modified LR test statistic (each test at 5% level), SC: Schwarz information criterion, HQ: Hannan-Quinn information criterion